The Contractor has begun the final demolition work on the Cottage in preparation for the relocation of the home to Park 7n. After severing the back bedroom additions on the Cottage last week, the bedroom additions were demolished today. These additions, added by subsequent owners, were not part of the original design and there had been some concern that the framing of these bedrooms had damaged the cantilevered roof overhang and the original Cottage framing at the points of attachment. The Contractor has worked carefully to detach the bedrooms and carefully examined the remaining structure. He is confident that any damage can be repaired as part of the exterior restoration work.